Varian 3180/90 & 3290 System Rebuild Specifications
The following components are replaced new:
- All O'rings, Quad rings & gaskets
- All water hose plumbing
- All pneumatic hose plumbing
- All vacuum hose plumbing
- Switches and switch actuators for doors, rams, & elevators
- Thrust washers, (10)
- Shoulder screws, (5)
- Needle bearings, (5)
- Sprocket, (5)
- Cassette drive chain
- All bearings
- All gas valve stems & seats
- All ceramic rings
- Conmags, (anode ceramic rings)
- Quantum's, (rotation bearings)
- Cassette optical sensor, (3)
- Flat aligner drive belts, (4)
- Wafer sense cable
- Wafer detect illumination lamp
- Elevator valve and solenoid
- Anti rotation strap
- Pancake cylinder, pressure plate ram back
- Proteus flow switch rotors, (4)
- Air silencer
- 35 PSI switches, (3)
- V9A - high vacuum valve solenoid 41E1
- V9 cylinder rebuild kit, (includes new bellows seal & O'ring
- Cryo pump screen
- All chamber stainless steel screws, nuts, washers & Turner washers
- Ion gauge tube
- Ion gauge cable
- Thermocouple gauge tubes, (3)
- Wafer clips, (20)
- Spring ring retainers, (10) / Spring ring shield retainers, (10)
- Anode caps, (3) & anode shield, (3)
- Vacuum switch 10HG
- Sieve trap material
- Compressor absorber
- All cooling fans that are inoperative will be replaced with new
Items inspected (Components replaced or repaired if worn or damaged):
- Heater elements
- Coaxial feed thru
- Shutter feed thru assemblies
- Solenoid valves, (check & replace if damaged or broken)
- Proteus flow switches
- Conmag source gun assemblies
- Wafer handler & flat aligner
- Wafer load door
- Front plate
- Rear plate
- Door actuator air cylinders
- Vacuum valves, (16)
- V9 - High vacuum gate valve assembly
- Vacuum plumbing system & manifold
- Vacuum chamber, stripped cleaned & rebuilt
- Pressure plate and load lock rams
- Pressure plate
- Transfer plate
- All plumbing - pneumatic, water & vacuum
- RF head & RF igniter, (if applicable)
Paint
All panels, system exterior & frame painted to OEM specifications with
Polyurethane paint.
Plexiglas
All Plexiglas replaced
Items sent out for chemical cleaning
All internal chamber shielding
Items sent out for rebuild / calibration
- Capacitance Manometer
- Mechanical pump
- Cryo pump
Final system qualifications
- Helium leak check complete system
- Argon line qualifications to, < 5.0x10-7
- Ensure pressure integrity, < 5.0x10-7
- Align wafer-handling system
- Set MKS zero & span, (250B controller)
- Pressure check all water plumbing
- Check heaters to 400 Deg. C in < 10 minutes and stable +/- 5%
- Set-up Argon system, (strike, normal and overpressure)
- Calibrate Conmag power supplies and signal distribution
- Test and calibrate RF power supply, (if applicable)
- Calibrate controllers, sensors and system power supplies
- Run 100 wafers with no errors
- Supply metal uniformity and specularity monitors to customer
Note: Customer to supply target(s) and monitor material